UtfordringRemoves dust from the process, significantly improving the working environment for employees. Additionally, the dust, which is a valuable product for the customer, is returned to the production loop. We achieve a closed system with maximum dust removal.
Periode
2025
Lokasjon
Glomfjord, Nordland
Kostnadsramme
Type prosjekt
Pollution Capture
Byggherre
INVIS
Levert av
Itek Green Technologies
KlimaCleans the air for workers, closes the process so that several tons of dust do not become waste, reduced climate footprint.
Hvilke fag/kompetanse har vi stilt med i prosessen/prosjektet?
Detailed engineering, project management, construction engineering
Nøkkeltall
Filter system with a capacity of 35,000 m³ of polluted air per hour.